Pools & Spa
5 categories
Manufacturer since 2008
OEM and ODM manufacturing for pools, water recreation and inflatable products.
Product families
7 product families.
5 categories
4 categories
4 categories
6 categories
3 categories
4 categories
2 categories
Company facts
Inside COMCO
PVC film, printing, welding, sewing, sampling, drop-stitch, the quality lab and mass production.
PVC film produced in-house, keeping material specification and lead time under direct control.
Printed graphics applied to film and finished goods.
Sewing lines for fabric-covered inflatable construction.
Physical prototypes and pre-production samples for buyer approval.
Drop-stitch construction for high-pressure products such as boards and air tracks.
Moving an approved sample into repeatable volume production.
Featured Innovation
From the first non-inflatable pool to our latest no-assembly frame pool.
In 2020, we asked a simple question: Could a pool work without inflation? After two years and 20–30 prototypes, that question became a patented product—and the beginning of our next generation of pool innovation.
Product development
01
A sketch, a reference product or a written specification.
02
Structure, material and cost worked out against the brief.
03
A physical sample built for your approval.
04
Changes agreed and re-sampled before tooling.
05
The approved sample moves into volume production.
Quality
Phthalate and heavy-metal documentation available for supplied material.
Available on Request
Every unit is inflated and held to confirm it holds pressure.
In-line inflation and pressure-hold station records.
PVC film is periodically tested by a third-party laboratory.
Third-party test reports held for film lots.
Every production batch is chemically tested in-house.
Internal laboratory test records held per batch.
Third-party inspection pass rate is reported as a company figure.
Summary Only
Finished goods are inspected on an AQL 1.5 sampling plan.
AQL inspection reports held per order.
Audits, compliance & program experience
An audit qualification applies to the manufacturing site it was carried out at, not automatically to every site.
A documented quality management system covers incoming material through to final inspection.
Available on Request
Film produced in-house is traceable from lot to finished goods.
Lot-to-order traceability records.
Audit and certification logos are not published until they have been confirmed internally.
Market
Trade shows
New York
Hong Kong
Guangzhou
Bangkok
Nuremberg
Shenzhen
Since 2008
Request a quote
Share your sketch, reference product, specification or sourcing requirement.