One supplier is a single point of failure.
A price move, a capacity squeeze or a late shipment lands on your season rather than on theirs.
Solution · Second Sourcing
Send the product you already sell — a sample, a drawing or the model reference. We read the construction, reproduce it, and quote a second source that can be held next to the product you ship today.
The Situation
A second supplier is rarely about wanting a new factory. It is a risk that has already appeared somewhere in the supply chain, and it has to be answered without lowering what the product already is.
A price move, a capacity squeeze or a late shipment lands on your season rather than on theirs.
Changes to a detail, a film or a packing method stall, and the product stops improving while the market moves.
If a second source cannot be checked against your current quality level, the switch costs more than the risk it removes.
COMCO Response
The first job is not a price. It is a product that can be held next to yours.
A physical sample, a technical drawing or the specification of the model you already buy. From that we read dimensions, film thickness, construction, print and accessories, and quote against a real construction rather than an assumption.
A reproduced sample goes through pre-production physical testing, and applicable inflatables are held under pressure for 24 hours before packing. Pre-shipment inspection runs at AQL 1.5, and your own third-party inspector is welcome at the factory.
Process in action
Four steps from the product you sell today to a second source you can compare against it.
01
Dimensions, film thickness, construction, print and accessories read from your sample or drawing.
02
A counter-sample built to the reviewed specification, for approval against your current product.
03
Pre-production physical testing, and a 24-hour holding test on applicable inflatables.
04
The approved sample released into repeatable volume production.
Evidence
Testing scope depends on the product and the market it is sold into: not every product carries the same test set. Audit and program experience is documented on Factory Audits & Compliance, where each program is stated with its own scope.
Where this leads
A second source is reproduced, verified and scaled through these capabilities.
Development
Physical prototypes and pre-production samples for buyer approval.
Engineering
Engineering work on an existing product: problem analysis, improvement and cost & value engineering.
Capability
Testing of materials and finished goods, and inspection before shipment.
Frequently Asked Questions
What buyers ask first about this problem, and how COMCO answers it.
Yes. Send a physical sample or a technical drawing. We read the dimensions, film thickness, construction, print and accessories, then build a counter-sample for you to compare against the product you sell today.
The model you want matched, its size, colour and pattern, the film thickness, the artwork where there is print, and any detail requirements. A physical sample shortens the process considerably.
Yes. Size, structure and film thickness can be adjusted during reproduction, so a second source can carry a better specification as well as a second address. That work is set out on Improve an Existing Product.
Open a second source
A sample, a drawing or a model reference is enough for us to review the construction and tell you what a counter-sample would involve.