Welding & Assembly
Joined and assembled to the approved sample.
Quality control
Quality is not a final inspection step. It is built into material control, product validation, production and final verification.
Quality at a glance
100%
Inflation Inspection
24 h
Pressure Holding Before Packing
AQL 1.5
Final Sampling Plan
Every 6 Months
PVC Film Tested at TÜV
Material is checked before it reaches the line, not after the goods are finished.
Every incoming material batch is chemically tested in house before it is released to the warehouse.
Which control applies depends on the material type and the control requirement, so not every batch receives every chemical test.
PVC material is sent to TÜV every six months for a wider panel than the routine in-house chemical checks.
Before a production run is released, trial products go to COMCO's in-house physical laboratory.
About two to three days before production starts, three to five trial products are made and sent to the in-house physical laboratory. A production run is only released once the test report passes.
Quality does not stop after pre-production approval; checks run alongside the line.
Joined and assembled to the approved sample.
Printed items checked for print fastness.
Stitched parts checked against the approved sample.
In-process inspection through the run.
Applicable inflatable products are inflated and held for 24 hours before packing, so a slow leak is found in the factory rather than by the customer.
Applicable inflatable products only — not every item in the range is inflated.
Most customers arrange a third-party inspection at the factory before shipment, and buyer-appointed inspectors are welcome.
Testing programmes are selected according to product type, construction and project requirements.
| Product Type | Applicable Testing Examples |
|---|---|
| Air Mattresses | Load / Impact / Rolling / Inflate-Deflate / Holding |
| Inflatable Pools | Inflate-Deflate / Water Test / Holding |
| Pool Floats | Load / Inflate-Deflate / Accessory Load / Holding |
These are applicable testing examples; not every SKU runs an identical test list.
Evidence
Applicable inflatable products are inflated and held for 24 hours to confirm they hold pressure.
In-line inflation and pressure-hold station records.
Every incoming material batch is chemically tested in-house before it is released to the warehouse.
Internal laboratory test records held per incoming material batch.
Phthalate, PAH and REACH documentation available for supplied material.
Available on Request
PVC film is tested by TÜV every six months.
Third-party test reports held for film lots.
Evidence
Finished goods are inspected on an AQL 1.5 sampling plan.
AQL inspection reports held per order.
Buyer-appointed third-party inspection before shipment is welcome, and it is arranged at the factory.
The inspection agency and the timing are chosen by the buyer.
Frequently Asked Questions
Applicable inflatable products are inflated and held before packing. Not every item in the range goes through an inflation test.
24 hours before packing.
Every incoming material batch is tested in the in-house chemical laboratory before it is released to the warehouse (phthalates 6P free and 18 PAH). PVC material is also sent to TÜV every six months for a wider panel including REACH SVHC, RoHS, PFAS and BPA.
Three to five trial products go to the in-house physical laboratory about two to three days before the run: accessory pull, HF weld seam pull, material tensile, 50 inflate/deflate cycles, static load, key-point hanging load and pool wave simulation. Production is released once the report passes.
Yes. Most customers appoint a third-party inspector to visit the factory before shipment. Product testing against a specific market requirement is arranged per project, and a report typically takes about 7–10 working days after the sample reaches the laboratory.
Test and audit documentation is shared with the customer for their own programme. Reports are not published for download on this site; the report covers we can show are on the Factory Audits & Compliance page.
Testing is selected per product type, construction and project requirement — not every SKU runs an identical test list.
Quality beyond the product
Walmart · Target · BSCI · Disney · Universal
Audit coverage is site-specific. The group operates eight self-owned plants, and which plant a given audit covers is confirmed against the individual report.
Request a quote
Send a sketch, a reference product or a specification and we will come back with the next step.