Quality control

Quality Control From Material to Shipment

Quality is not a final inspection step. It is built into material control, product validation, production and final verification.

100% Inflation Inspection 24 h Pressure Holding AQL 1.5 Final Sampling
COMCO in-house test laboratory
COMCO in-house test laboratory

Quality at a glance

The numbers this page is built on

  • 100%

    Inflation Inspection

  • 24 h

    Pressure Holding Before Packing

  • AQL 1.5

    Final Sampling Plan

  • Every 6 Months

    PVC Film Tested at TÜV

Material Control Before Production

Material is checked before it reaches the line, not after the goods are finished.

CHEMICAL TEST LABORATORY

Incoming Materials

  • Supplier sample approval where applicable
  • Incoming inspection
  • Material-specific checks
  • Sampling controls
  • Supplier test information where applicable

In-House Chemical Laboratory

Every incoming material batch is chemically tested in house before it is released to the warehouse.

  • Phthalates 6P free
  • 18 PAH

Which control applies depends on the material type and the control requirement, so not every batch receives every chemical test.

PVC Film Control

  • Appearance
  • Width
  • Thickness
  • Tensile / Elongation
  • Colour Migration
  • Applicable Chemical Control

Six-Monthly Third-Party Panel

PVC material is sent to TÜV every six months for a wider panel than the routine in-house chemical checks.

  • Phthalates 10P free
  • PAHs 28P
  • REACH SVHC
  • BPA
  • RoHS
  • PFAS
  • CHCC

Test Before We Scale

Before a production run is released, trial products go to COMCO's in-house physical laboratory.

PHYSICS TEST LABORATORY

About two to three days before production starts, three to five trial products are made and sent to the in-house physical laboratory. A production run is only released once the test report passes.

Physical Tests

  • Accessory pull test
  • HF weld seam pull test
  • Material tensile test
  • 50× inflate / deflate cycles
  • Static load test
  • Key-point hanging load
  • Pool wave simulation
  • Tooling Setup
  • Process Parameters
  • Trial Product
  • Physical Testing
  • PASS
  • Mass Production
  • FAIL
  • Adjust
  • Retest

In-Process Control

Quality does not stop after pre-production approval; checks run alongside the line.

01 WELDING & ASSEMBLY

Welding & Assembly

Joined and assembled to the approved sample.

02 PRINTING

Printing

Printed items checked for print fastness.

03 SEWING

Sewing

Stitched parts checked against the approved sample.

04 MASS PRODUCTION

Mass Production

In-process inspection through the run.

24-HOUR AIR TEST

100% Inflation & Pressure Holding

Applicable inflatable products are inflated and held for 24 hours before packing, so a slow leak is found in the factory rather than by the customer.

  • 100%Inflation Inspection
  • 24 hPressure Holding Before Packing

Applicable inflatable products only — not every item in the range is inflated.

Final QA & Inspection

Final Sampling Inspection

  • Final sampling inspection
  • AQL 1.5 sampling plan
  • Packaging check
  • Finished-goods check

Customer / Third-Party Inspection

Most customers arrange a third-party inspection at the factory before shipment, and buyer-appointed inspectors are welcome.

QA INSPECTION

Testing Based on Product Type

Testing programmes are selected according to product type, construction and project requirements.

Product Type Applicable Testing Examples
Air Mattresses Load / Impact / Rolling / Inflate-Deflate / Holding
Inflatable Pools Inflate-Deflate / Water Test / Holding
Pool Floats Load / Inflate-Deflate / Accessory Load / Holding

These are applicable testing examples; not every SKU runs an identical test list.

Testing Gallery

Photographs of tests run on COMCO products.

Evidence

Testing

  • Product

    100% Inflation and Pressure Holding

    Applicable inflatable products are inflated and held for 24 hours to confirm they hold pressure.

    In-line inflation and pressure-hold station records.

  • Company

    Internal Chemical Testing on Incoming Material

    Every incoming material batch is chemically tested in-house before it is released to the warehouse.

    Internal laboratory test records held per incoming material batch.

  • Material

    Material Safety Documentation

    Phthalate, PAH and REACH documentation available for supplied material.

    Available on Request

  • Material

    Periodic TUV Chemical Testing of PVC Film

    PVC film is tested by TÜV every six months.

    Third-party test reports held for film lots.

Evidence

Inspection

  • Product

    AQL 1.5 Sampling Inspection

    Finished goods are inspected on an AQL 1.5 sampling plan.

    AQL inspection reports held per order.

  • Order

    Third-Party Pre-Shipment Inspection

    Buyer-appointed third-party inspection before shipment is welcome, and it is arranged at the factory.

    The inspection agency and the timing are chosen by the buyer.

Frequently Asked Questions

Quality FAQ

Applicable inflatable products are inflated and held before packing. Not every item in the range goes through an inflation test.

24 hours before packing.

Every incoming material batch is tested in the in-house chemical laboratory before it is released to the warehouse (phthalates 6P free and 18 PAH). PVC material is also sent to TÜV every six months for a wider panel including REACH SVHC, RoHS, PFAS and BPA.

Three to five trial products go to the in-house physical laboratory about two to three days before the run: accessory pull, HF weld seam pull, material tensile, 50 inflate/deflate cycles, static load, key-point hanging load and pool wave simulation. Production is released once the report passes.

Yes. Most customers appoint a third-party inspector to visit the factory before shipment. Product testing against a specific market requirement is arranged per project, and a report typically takes about 7–10 working days after the sample reaches the laboratory.

Test and audit documentation is shared with the customer for their own programme. Reports are not published for download on this site; the report covers we can show are on the Factory Audits & Compliance page.

Testing is selected per product type, construction and project requirement — not every SKU runs an identical test list.

Quality beyond the product

Factory Audits & Compliance

Walmart · Target · BSCI · Disney · Universal

Audit coverage is site-specific. The group operates eight self-owned plants, and which plant a given audit covers is confirmed against the individual report.

Request a quote

Ask how your product is checked

Send a sketch, a reference product or a specification and we will come back with the next step.