Solution · Cost Engineering

Meet a Target Cost

When a configuration cannot be sold at the price the market allows, the answer is usually a different configuration rather than a smaller margin. We adjust size, structure and film thickness to get closer to your target, and quote the change.

FOB & EXW Quotation basis 3 Months Quotation validity 3,000–5,000 Typical minimum per model
In-House PVC Film Production Line
In-House PVC Film Production Line

The Situation

When the Price and the Product Do Not Meet

A target price is not always a request for the cheapest quote. It is the point at which the product, the packing and the retail price have to agree.

01 / The Gap

The quoted configuration does not fit the price the product sells at.

Material, labour, packing and freight move, and a specification that worked last season stops working at the same shelf price.

02 / The Easy Answer

Taking the lowest quote usually moves the risk somewhere else.

A construction that cannot hold, or a supplier that cannot repeat the run, costs more than the difference it appeared to save.

03 / Where Cost Lives

Cost sits in size, structure, film and packing.

Those are engineering decisions, and they can be changed deliberately rather than discounted blindly.

COMCO Response

Adjust the Product, Not Only the Margin

Cost engineering means changing what the product is made of and how it is built, then quoting the result.

Size, structure, film thickness, configuration
Cost levers

Size, structure, film thickness, configuration

These are the levers we adjust when a specification has to land closer to a target price. Each change is quoted, so you can see what it buys and what it gives up before you commit.

  • Size and structure re-engineered
  • Film thickness and formulation adjusted
  • Carton and container load reviewed
Material control

Film made in-house

PVC powder, our own formulation and our own calendering line: a film change is a production decision rather than a purchase order, and material lead time runs roughly 7–10 days shorter than buying film in.

  • In-house formulation and calendering
  • Material lead time roughly 7–10 days shorter
  • Specification held between runs

Process in action

From Target Price to a Quotation

The target comes first; the specification is built to reach it.

  1. 01

    Target & Volume

    The price the product has to sell at, the volume behind it, the market and the packing.

  2. 02

    Cost Levers

    Cost Levers

    Size, structure, film thickness, configuration and carton load reviewed against the target.

  3. 03

    Counter Sample

    Counter Sample

    The revised configuration sampled, so the change can be held and compared.

  4. 04

    Validation

    Validation

    Pre-production physical testing, and a 24-hour holding test on applicable inflatables.

  5. 05

    Quotation

    Quoted FOB or EXW against the agreed specification, valid for three months.

Evidence

What the Quotation Rests On

45–120 Days Production lead time Typically 45–60, 60–90 or 90–120 days, depending on the product and the season.
3 Months Quotation validity Quoted FOB or EXW against the agreed specification, in US dollars or cross-border RMB.
8 Factories Owned capacity 2,000+ staff and 70+ production lines across eight owned factories.

We aim to get close to a target price and will say when a configuration cannot be built at that price. Minimum order is typically 3,000–5,000 units per model and is discussed per project rather than fixed.

Where this leads

Related capabilities and products

Cost is engineered through these capabilities, and quoted against the product family it belongs to.

01

Engineering

Product Engineering

Engineering work on an existing product: problem analysis, improvement and cost & value engineering.

02

Manufacturing

In-House PVC Film Production

PVC film produced in-house, keeping material specification and lead time under direct control.

03

Manufacturing

Custom Printing

Printed graphics applied to film and finished goods.

Frequently Asked Questions

Meet a Target Cost FAQ

What buyers ask first about this problem, and how COMCO answers it.

Yes. Tell us the price the product has to sell at and the volume behind it. We review size, structure, film thickness, configuration and packing against that target, then quote the revised specification. We aim to get close, and we will also say when a configuration cannot be built at that price.

Typically 3,000–5,000 units per model, discussed per project rather than fixed.

FOB or EXW, in US dollars or cross-border RMB, against the agreed specification. A quotation holds for three months.

Engineer the cost

Send the target price and the volume behind it.

Give us the price point and the market. We will come back on which levers move the cost, what the revised specification looks like, and what it costs.